Projects
-
Wahnbachtalsperre
Polyplan designed 2 Tibeans for the reservoir Wahnbachtalsperre with a capacity of 14.400 m³/hour.
Contractor: Wahnbachtalsperrenverband, Mr. Krohm
Period: 2014
Phases: 1-5Place: Siegelsknippen 53721 Siegburg
Construction costs: 630.000 €
-
Floating Pool Gothenburg
Our engineers together with Raumlabor (Berlin), created the floating pool in the Frihman, Gothenburg.
Period: 2015
Phases: 1-9Place: Frihamnen 9, Gothenburg, Sweden
-
Lake Steinbrunn
Deep water aeration in the lake SteinbrunnContractor: community Steinbrunn
Period: 2010
Phases: 1-9Place: Lake Steinbrunn, Obere Hauptstraße 1, 7035 Steinbrunn
Construction costs: 80,000
-
Tibean Kahrteich
Contractor: Marktgemeinde Wiener Neudorf
Period: 1997Place: Europaplatz 2, 2351 wiener Neudorf
Construction costs: 58,000 €
-
Glambecker Lake
Planning office: bioplan GmbH
Wikipedia deep water aeration
Contractor: City Neustrelitz
Period: 2007Place: Glambecker See, 17235 Neustrelitz
Construction costs: 50.000 €