Wahnbachtalsperre
Polyplan designed 2 Tibeans for the reservoir Wahnbachtalsperre with a capacity of 14.400 m³/hour.
Contractor:
Wahnbachtalsperrenverband, Mr. Krohm
Period:
2014
Phases:
1-5
Place:
Siegelsknippen 53721 Siegburg
Construction costs:
630.000 €
Floating Pool Gothenburg
Our engineers together with Raumlabor (Berlin), created the floating pool in the Frihman, Gothenburg.
Period:
2015
Phases:
1-9
Place:
Frihamnen 9, Gothenburg, Sweden
Lake Steinbrunn
Deep water aeration in the lake Steinbrunn
Contractor:
community Steinbrunn
Period:
2010
Phases:
1-9
Place:
Lake Steinbrunn, Obere Hauptstraße 1, 7035 Steinbrunn
Construction costs:
80,000
Tibean Kahrteich
Contractor:
Marktgemeinde Wiener Neudorf
Period:
1997
Place:
Europaplatz 2, 2351 wiener Neudorf
Construction costs:
58,000 €